The CNM line – the Nîmes and Montpellier rail bypass – entered service in December 2017 and is operated under a public-private partnership (PPP) arrangement. The contract covers the construction of the line as well as infrastructure maintenance for the subsequent 20 years (2018-2037).
This assignment is part of the phased preparation for the end of the concession in 2037; it aims to equip Oc’via Maintenance with methods and tools to objectively determine the best asset strategies to adopt in order to meet the needs of the various stakeholders.
President Oc’Via Maintenance: “IMDM is a well-known and respected player in railway asset management. It was important for us to have professional support for this process – working with industry experts capable of challenging models and who have proven their methods through collaborations with partners, peers and clients.”
The assignment is structured around the provision of consulting services and access to Eqylibr®, with the aim of:
Specifically, the assignment entails:
Over a six-month period, developed the investment trajectory and formalised deliverables for all technical domains, based on the client’s asset inventory.
Find out how Eqylibr® can simplify your day-to-day challenges.
The brand as well as the Eqylibr® tool are properties of IMDM. Eqylibr® is developed by SWI2M, the digital subsidiary of IMDM.
Startup Madeira, C. da Penteada
freguesia de São Roque
9020-105 Funchal